79454030

Date: 2025-02-20 09:56:50
Score: 3.5
Natty:
Report link

I want product backlog items (PBIs) to default to the current iteration (sprint) but not epics (quarterly SAFe objectives) and features (quarterly features to be delivered). Now they are all defaulting to the current sprint which is annot

Reasons:
  • RegEx Blacklisted phrase (1): I want
  • Low length (0.5):
  • No code block (0.5):
  • Single line (0.5):
  • Low reputation (1):
Posted by: Codermom NL