Date: 2025-03-31 23:10:27
Score: 2
Natty:
You have
- old_measure = … old ABC rule
You can create
- new_measure = … new ABC rule
- composite_measure = … assign/choose old_measure or new_measure depending on the selected date is before or after the cut-off date
and use
- composite_measure in the visuals replacing old_measure
Reasons:
- Low length (0.5):
- No code block (0.5):
- Unregistered user (0.5):
- Low reputation (0.5):
Posted by: Anonymous