79618235

Date: 2025-05-12 16:04:25
Score: 4
Natty:
Report link

What ended up working (at least for what I need) is actually using =DATEDIF(A11, today(), "D") and then dividing that number of days by 30.4347. I got the 30.4347 by dividing 365.25 (ignoring centurial years, (365+365+365+366)/4 = 365.2425) by 12 months.

Reasons:
  • Blacklisted phrase (0.5): I need
  • Low length (0.5):
  • No code block (0.5):
  • Self-answer (0.5):
  • Single line (0.5):
  • Starts with a question (0.5): What
  • Low reputation (1):
Posted by: Tristan Privott