79759793

Date: 2025-09-09 10:57:17
Score: 2
Natty:
Report link

This would require the creation of an independent date table. That date table will not be connected to the current model.

When using this measure, make sure to use the date column from the independent table in the visual.

Reasons:
  • Low length (0.5):
  • No code block (0.5):
  • Low reputation (1):
Posted by: Chirag Garg